ENG 7B removal
.pdf
|
CFM56-7B |
TRAINING MANUAL |
|
||
|
|
|
ENGINE REMOVAL AND INSTALLATION
TRAINING COURSE
|
|
|
Document: GEK 112143R6 |
|
EFFECTIVITY 737-600/700/800/900/BBJ/C40A/B/C/P8A/MMA/AWAC |
|
CFM PROPRIETARY INFORMATION |
71-00-00 |
1 |
|
Sept. 2006
|
CFM56-7B |
TRAINING MANUAL |
|
||
|
|
|
Blank Page
EFFECTIVITY 737-600/700/800/900/BBJ/C40A/B/C/P8A/MMA/AWAC |
|
CFM PROPRIETARY INFORMATION |
71-00-00 |
2 |
|
||||
|
|
|
Sept. 2006 |
|
CFM56-7B |
TRAINING MANUAL |
CFM56-7B
Removal & Installation Training Course
|
The Power |
|
Of Flight |
|
Document: GEK 112143R6 |
CFM Proprietary Information |
Revised: Sept. 2006 |
|
The information contained in this document is CFM Proprietary Information and is disclosed in confidence. It is the property of CFM and shall not be used,
disclosed to others, or reproduced without the express written consent of CFM International. If consent is given for reproduction in whole or in part, this notice and the notice set forth on each page of this document shall appear in any such reproduction in whole or in part. The information contained in this document may also be controlled by
the U.S. export control laws. Unauthorized export or re-export is prohibited.
EFFECTIVITY 737-600/700/800/900/BBJ/C40A/B/C/P8A/MMA/AWAC |
|
CFM PROPRIETARY INFORMATION |
71-00-00 |
3 |
|
||||
|
|
|
Sept. 2006 |
|
|
CFM56-7B |
TRAINING MANUAL |
|
||
|
|
|
Blank Page
EFFECTIVITY 737-600/700/800/900/BBJ/C40A/B/C/P8A/MMA/AWAC |
|
CFM PROPRIETARY INFORMATION |
71-00-00 |
4 |
|
||||
|
|
|
Sept. 2006 |
|
|
|
CFM56-7B |
TRAINING MANUAL |
|
|||
|
|
|
|||||
|
|
Table of Contents |
Page 05 |
|
|||
|
|
|
|||||
|
|
Power Plant Removal Preparation ………………………………………………..… |
Page 07 |
|
|||
|
|
Engine Preservation ………………………………………………………………..… |
Page 13 |
|
|||
|
|
Engine History Data, Tests And Inspections ………….……………………….… |
Page 15 |
|
|||
|
|
Airplane Preparation ……………………………………………………………….…. |
Page 33 |
|
|||
|
|
Static Grounding ………………………………..………………………………….…. |
Page 41 |
|
|||
|
|
Airplane Leveling …………………..……………………………………………….…. |
Page 43 |
|
|||
|
|
Engine Nacelle ……………………………………………………………………….… |
Page 47 |
|
|||
|
|
Fan Cowling …………………………………….……………………………………… |
Page 49 |
|
|||
|
|
Thrust Reverser Safety Tooling ……………………………………………………. |
Page 55 |
|
|||
|
|
Thrust Reverser Hold Open Tooling ………………………………………………. |
Page 59 |
|
|||
|
|
Fuel System Preparation …………………………………………..……………….… |
Page 69 |
|
|||
|
|
Engine Quick Disconnects ……………………………………………………….…. |
Page 71 |
|
|||
|
|
Engine Core Disconnects …………..……………………………………………..… |
Page 79 |
|
|||
|
|
Thumbnail Fairing …………………………………………………………………….. |
Page 89 |
|
|||
|
|
Forward Bootstrap Tooling …………………………………………………….…… |
Page 91 |
|
|||
|
|
AFT Bootstrap Tooling ……………………………………………………………..… |
Page 119 |
|
|||
|
|
Engine Transportation Stand …………………………………………………….…. |
Page 129 |
|
|||
|
|
Engine Mounts …………………………………………………………………….….. |
Page 139 |
|
|||
|
|
Engine Transportation ……………………………………………………………...… |
Page 163 |
|
|||
|
|
Thrust Reverser Tooling ……………………………………………………….……… Page 167 |
|
||||
|
|
Engine Inlet Tooling …………………………………………………………………… |
Page 189 |
|
|||
|
|
|
|
|
71-00-00 |
|
|
EFFECTIVITY 737-600/700/800/900/BBJ/C40A/B/C/P8A/MMA/AWAC |
|
|
CFM PROPRIETARY INFORMATION |
5 |
|||
|
|||||||
|
|
|
|
|
|
Sept. 2006 |
|
|
CFM56-7B |
TRAINING MANUAL |
|
||
|
|
|
Blank Page
EFFECTIVITY 737-600/700/800/900/BBJ/C40A/B/C/P8A/MMA/AWAC |
|
CFM PROPRIETARY INFORMATION |
71-00-00 |
6 |
|
||||
|
|
|
Sept. 2006 |
|
CFM56-7B
Power Plant Removal Preparation
General Description
Before power plant removal begins, read the procedures and understand them. Note carefully the warnings, cautions, tooling, inspections, checks and consumable products before you begin. A full overview is needed before beginning and after installation to save time and avoid possible oversights.
EFFECTIVITY 737-600/700/800/900/BBJ/C40A/B/C/P8A/MMA/AWAC |
CFM PROPRIETARY INFORMATION |
TRAINING MANUAL
71-00-00 7
Sept. 2006
|
CFM56-7B |
TRAINING MANUAL |
|
||
|
|
|
POWER PLANT REMOVAL PREPARATION
EFFECTIVITY 737-600/700/800/900/BBJ/C40A/B/C/P8A/MMA/AWAC |
|
CFM PROPRIETARY INFORMATION |
71-00-00 |
8 |
|
||||
|
|
|
Sept. 2006 |
|
|
CFM56-7B |
TRAINING MANUAL |
|
||
|
|
|
Power Plant Removal Preparation |
Power Plant Installation |
General Description
Before power plant removal begins, many tasks need to be considered, they are:
1.Engine history and recording faults
2.Data retrieval and storage
3.Engine preservation
4.Special Inspections
5.BITE tests
6.Ground tests
7.Erasing old faults and data
8.AVM checks
9.Other Front face BITE checks
10.Shop visit and engine history information
General Description
After power plant installation, many tasks need to be considered, they are:
1.Checking for current status of faults stored
2.Erasing EEC/DEU data fault check
3.Engine Serial number CDU input
4.FMC and EEC software status
5.ID plug verification status
6.Ground tests
7.BITE tests
8.Erasing faults and data status
9.Other Front face BITE checks
10.Engine depreservation
EFFECTIVITY 737-600/700/800/900/BBJ/C40A/B/C/P8A/MMA/AWAC |
|
CFM PROPRIETARY INFORMATION |
71-00-00 |
9 |
|
||||
|
|
|
Sept. 2006 |
|
|
|
CFM56-7B |
TRAINING MANUAL |
|
|
||
|
DMS |
EAU |
ID PLUG |
|
ACARS
DFDAU
AVMM
DFDR
DEU’s
MCD’s
CDU
BSIBSI
PDLPDL
QARQAR
|
GROUNDD TESTSTESTS |
EEC BITE |
INPUT MONITORINGRING |
PRESERVATION
POWER PLANT REMOVAL PREPARARTION
EFFECTIVITY 737-600/700/800/900/BBJ/C40A/B/C/P8A/MMA/AWAC |
|
CFM PROPRIETARY INFORMATION |
71-00-00 |
10 |
|
||||
|
|
|
Sept. 2006 |
|